May 20th  -- The fabricator came by to install the back splash in the second upper-level bathroom last night, as shown here.  Hopefully, the painter will come by late this afternoon and will complete touch-ups and reinstall all the trim pieces and fixtures that were removed for painting.  If all goes according to plan, then all this bathroom will need is a good cleaning and it will be done.  



May 21st -- The plantation shutters were installed in the living room in 2002.  When they were removed when the windows were replaced, the contractor told me it would be my responsibility to have the shutters re-installed.  Fortunately, I had remembered the name of the company that installed them and they were still in business.  This morning they came out and were able to use the frames and re-installed the shutters.





May 23rd -- The crazy spring weather continues.  Tornado warnings, hail (which shredded the blue berry bushes a bit, but they will survive) and downpours like this -- maybe my raised beds are turning into rice paddies?








May 23 rd -- The last phase of "construction cleaning" is on the slate for today.  In an effort to remove all construction dust and general chaos, the walls, floors and basically all surfaces were vacuumed and cleaned.  The painter came to do some touch ups, and the house is really coming together.

The upper-level sitting room



The upper-level bedroom that typically serves as my home office and was the room that I lived in during the construction:




The main level living room (with a peek at the front door and foyer)





The main level guest suite (open door leading to the guest bath) with some window treatments.


The view, from the kitchen, looking into the dining room and into the living room.

The foyer, with an oak coat rack brought in from storage in the garage and the new mail slot next to the front door.





The plan for tomorrow is to move beds and pick up some couches.



Sunday, May 18, 2014

Inching closer -- inside and out.....

Inching closer -- inside and out....

May 18th -- The new finish carpenter arrived early at 8:10 instead of 8:30 and was rearing to go.  He is a very nice young man with skills that match his disposition.

The contractor thought it would take between 5 and 6 hours to remove the shattered library door because the mill work had to be removed.  I was amazed when the finish carpenter told me it was done after only 3 hours passed, and there was no construction or dry wall dust.  In fact, this guy is so meticulous that he cleans up as he works.  AWESOME!


Here is the new door with the protective film still on the glass.  He will need to return to install the door hardware as he didn't have that tool with him.


After the door was done, he installed the remaining quarter-round base shoe trim in the guest suite closet.


Then he called me and asked what needed to be done in the upper-level bathroom.  In addition to installing the sink faucet and setting the new toilet, there was a medicine cabinet to mount, towel bars, and other bathroom fixtures.




Wow..what a great job.  He will come back tomorrow early evening with the plumbing lines necessary to make the faucet and the toilet functional as those parts were not on site.  Given the rest of the items on the punch list, he expects to finish next Sunday.

While all that work was going on inside, I was back outside trying to get the yard in shape.  I have lots of day lilies in the front yard that need to be thinned, so I dug them up and decided to add them to the new perennial bed inside the front privacy fence by the flagstone patio.  In addition to transplanted day lilies, I added some small lavender plants and two leopard's bane plants that were on the clearance rack.  With the two blue berry bushes planted yesterday, this bed is done for now and the bird bath has a new home.




The Month of May's official flower is the lily of the valley, and sure enough the ones in the yard were in bloom -- right next to a hosta that is just coming out.



Tomorrow morning the company that installed the plantation shutters in the living room several years ago will return to let me know what it will take to re-install the shutters.


Saturday, May 17, 2014

Now you see it, now you don't -- part 2

Now you see it, now you don't -- part 2

May 17th  -- Back by popular demand...

Now you see it,



Now you don't,


The pile of planter's mix soil is now officially in the raised beds, and all that remains by the back of the garage door is some mulch, which will be relocated after I get around to planting some shrubs.


Here are the raised beds, waiting for me to plant them!


:


























In the mean time, I did get around to planting two blueberry bushes today
























Tomorrow morning a new finish carpenter will come to work on replacing the shattered library door and if begin to work on setting the plumbing fixtures in the second upper-level bath.

Thursday, May 15, 2014

Now you see it, now you don't....

Now you see it, now you don't.....


May 15th -- as the one-year mark is approaching, every bit of progress toward completion, no matter how big or small, is a reason to celebrate.

Now you see it:


Now you don't:


Yippie -- the portable toilet is gone!


Tuesday, May 13, 2014

May snowstorms bring.....

May snowstorms bring....



May 11 - 13th  -- The Mother's Day snow storm arrived as promised.  The wet snow started to stick to the newly budded leaves and blossoms.  Here is some snow on the lilac blooms, before I took a broom and went out to shake the snow off the trees.




There is a light dusting of snow on the raised beds...


But, the snow didn't stop Eric from returned to prep the floors and apply a coat of stain before he left for the day.  He told me to wait for about three hours before walking on the floors, and I could only walk on the floors with socks on my feet.


Here is the living room and a peak into the foyer...






Here is the view of the stained foyer from the stairs...



Here is the upstairs front bedroom/office:


Here is the upstairs sitting room:


Eric will be back tomorrow to apply the first two of three clear coats, with the final coat and buff to take place on Tuesday.

As predicted, the late spring snowstorm hit big time.  The temps plummeted to the mid-20s overnight, meaning that I had to drain the new sprinkler system, and the snow was wet, which meant I had to go outside at least 4 times over a 36-hour period to try to get the snow off the trees before the weight snapped branches.  The wind was nasty and although the storm brought much needed moisture, it cast a very wet blanket on the prior arrival of spring.

Here, the photos of the yard in the storm speak more than words:







However, the best part of the cold weather and the storm is that I've been enjoying the fireplaces!



Fortunately, the trees survived snowstorm and the lilac blooms did ok.

Eric came back today to apply the final clear coat and to finish the floors, which will have three coats of clear coat finish on top of the stain.  Tonight I can walk on the floors in my stocking feet and by tomorrow morning I can walk on the floors with shoes on.  By tomorrow afternoon I can begin moving furniture and I'll start by putting the desk back in my upstairs office

These photos really don't do justice to how amazing the floors look and what a great job Erci did.  Here is the living room:





 Here is the foyer:




 Here is the upper-level sitting room:



 And, here is the upper-level front bedroom/office:





With the building boom going strong, the contractor is having a difficult time getting the finish carpenter and the plumber back to finish the upper-level second bathroom and to replace the library door with the shattered glass.  He called this morning to tell me that he has found a craftsman who can do this work, and he will be here all day Sunday to finish up.

  I am keeping my fingers crossed that this guy is as good as the previous craftsmen and hope that this all works out. 

 If so, then it is a matter of getting the painters back to finish touch ups inside and outside.  There is still the issue of the refrigerator, which has taken on a story of its own and once resolved will receive its own exclusive blog post. Then I can begin the process of rediscovering all the stuff that has been stored in my garage for almost a year.  

In the mean time, the completion of this project is well in sight!