Tuesday, November 19, 2013

Walls going up...part 2

Walls going up...part 2


November 19th --  When I arrived home I couldn't wait to see how much progress the dry wall guys had made.  They are still working on the walls on the main level, and they have done an amazing job.




To the left is the drywall in the laundry room, and to the right is the same wall without drywall





To the left is the laundry room with drywall and to the right is the laundry room without drywall






To the left is the pantry with drywall and to the right is the pantry before the drywall.


Below and to the left is the 3/4 bath off the gathering room with drywall, and below and to the right is the 3/4 bath without drywall





To the left is the stairwell to the basement with drywall and to the right is the stairwell before drywall










Below and to the left is the southwest corner of the gathering room with drywall (with the mudroom rear entry on the left side of the photo) and below and to the right is the same southwest corner without drywall.

Below and to the left is the rear-entry door with drywall and to the right is before drywall


There is still more drywall work to be done on the main floor and then they will move to the upper-level to drywall the master bedroom and bath -- that will be a real chore as they have to lift the drywall up to the 13 foot high gabled ceiling in the master bedroom.  They expect to be done by tomorrow as the inspection of the screws that hold the drywall to the studs in the wall frames has been scheduled for Thursday at 1:00.

I am hoping the weather is good tomorrow so I can take photos of he 99.9% completed exterior paint job.  The painters are essentially done and I will meet with the owner of the painting company in the morning to go over a few of the final details.  The painting crew needs to move on to start another job tomorrow, but they will be back in a few days to complete a few trim pieces.











No comments:

Post a Comment